If you were in and around the Pacific Northwest (PNW) this winter you knew it was epic. 10-12 snow days for the schools, icemaggedon, closed roads, abandon cars and on and on and on….Many people ask “what happens to your compost in all this snow”. My usual answer is ‘the compost is the only thing that’s fine, it’s the people and equipment that suffer’. True, minus the outer 6″ our compost piles are typically happily humming along and breaking down into rich compost. But, everything else suffers in the winter and this year was a chart topper. As an homage to the winter that broke our spirits (and all of our equipment) here is a highlight of everything we ruined this past winter.

  1. Meltdown: 250 HP Caterpillar motor plus turbo completely gone.
    Cause: missing 3 out of 4 gallons of oil
    Fix: whole new engine (yikes)
    Cost: $$$$$
     
  2. Meltdown: pump on water truck frozen. Pump shaft sheared off.
    Cause:  arctic conditions
    Fix: try to thaw it out with a torch and melt all air hose lines rendering truck undriveable.
    Fix part II: replace all air hoses with new air hoses. replace pump with new pump
    Cost:$$$
     
  3. Meltdown: rear drive on 26,000 lb front end loader roasted
    Cause: Cold and angry
    Fix: All new drive line
    Cost: $$$$
     
  4. Meltdown: bagger machine switch gone rogue, stuck on, and dumps compost all over the place
    Cause: frozen contactor and switch stuck on
    Fix: pull contacter out, file down, replace
    Cost: a little bit of time and frustration (not too bad, all-in-all)
     
  5. Meltdown: 5 compost turner flights mutilated
    Cause: Christmas trees, rocks, and unwanted objects
    Fix: Laborious flight replacement, and a set of full-time eagle eyes to spot potential flight destroyers
    Cost: pulling hair out for days
     
  6. Meltdown:  Street sweeper tire flies off
    Cause: Mario Andretti (and a few loose nuts)
    Fix: Quick trip to the tire shop; for the operator–a tandem ride along with our resident sweeping master, Duke, should do the trick
    Cost: about $20 bucks and a few good laughs
     
  7. Meltdown:  New pond aerators burned up
    Cause: they hated winter
    Fix: two new pond aerators
    Cost: some under warranty plus $
     
  8. Meltdown:  3 out of 3 items ordered, damaged upon arrival (2 pumps, 1 compressor)
    Cause: upset delivery drivers? slick roads? rolling off the truck?
    Fix: warranty (thanks Grainger)
    Cost: time

 

our compost turner’s engine needs oil, apparently.

high-air leachate pond with a snow-laden dalles mt. in the background.

kevin wrangled the bagger into working order.

luckily, we do have one working loader–building custom soil blending bays for the upcoming spring

About dirthuggercompost

Co-founder of Dirt Hugger
This entry was posted in Latest News and tagged , , , , , . Bookmark the permalink.

One Response to Failure Part 63: Winter Meltdown

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s